All private sewage installations require an approved Development Permit. Please fill out the permit, including a site plan showing the distances from the neighboring water sources. Your approved contractor should be able to help you with that.

PLEASE NOTE: *****YOU WILL NEED TO CONTACT SUPERIOR SAFETY CODES AND SET UP A BACK FILL DATE AS THE SYSTEM IS REQUIRED TO BE INSPECTED PRIOR TO BEING BACK FILLED. FAILURE TO DO SO WILL RESULT IN THE CONTRACTOR DIGGING THE SYSTEM BACK UP FOR A PROPER INSTPECTION.*******

Private Sewage Permit